Grounding Electrodes: What Counts Under NEC 250.52, Myth vs Fact

/ 6 min read / By CircuitDrill

Ask five apprentices what counts as a grounding electrode and you will hear five different lists. Some of the confusion comes from old habits, some from half-remembered exam tips. This article takes the claims that come up most often and checks each one against NEC 250.50, 250.52 and 250.53. The format is simple: a myth, then the fact.

One note before we start. Section numbers and values below follow the 2020 and 2023 editions of NFPA 70, as described in the sources linked at the end. Your state may have adopted a different edition, and the authority having jurisdiction (AHJ) has the last word. Read the actual text in your own code book.

First, what is a grounding electrode system?

A grounding electrode is a conducting object that makes a direct connection to the earth. At a service, the electrodes that are present are bonded together to form the grounding electrode system. Section 250.52(A) is the list of things that are allowed to serve as electrodes. Section 250.52(B) is the short list of things that are not.

The permitted electrodes, 250.52(A)

ElectrodeKey numbers
Metal underground water pipe10 ft or more in direct contact with earth
Metal in-ground support structure10 ft or more in vertical contact with earth
Concrete-encased electrode20 ft of rebar at least 1/2 in. diameter, or 20 ft of bare copper, 4 AWG or larger, with at least 2 in. of concrete cover
Ground ring20 ft or more of bare copper, 2 AWG or larger, encircling the building
Rod or pipeAt least 8 ft long; pipe at least 3/4 in. trade size; rods at least 5/8 in. diameter unless listed
Listed electrodesAs listed and installed per instructions
PlateAt least 2 sq ft of surface exposed to soil; iron or steel at least 1/4 in. thick
Other local metal underground systemsPiping systems, underground tanks and some well casings

You do not need to memorize every thickness on day one. Start with the pattern: most items need a minimum length in the earth, and the concrete-encased electrode needs concrete around the metal.

Myth 1: One ground rod is always enough

Fact: A single rod, pipe or plate electrode must be supplemented by an additional electrode unless its resistance to earth is 25 ohms or less (250.53(A)(2)). The supplemental electrode does not have to be a second rod, and when you do add more rods, keep them at least 6 ft apart. That is why you see two rods on so many services: it is the simple way to avoid a resistance measurement.

Myth 2: The underground gas pipe is a fine electrode

Fact: Underground metal gas piping systems are on the not-permitted list in 250.52(B). Aluminum is on the same list. So are the pool structures and structural reinforcing steel described in 680.26(B)(1) and (B)(2). Pool steel still has to be bonded as part of the pool rules, but bonding it does not turn it into a grounding electrode.

Myth 3: If the water pipe is metal, the job is done

Fact: A metal underground water pipe counts only when at least 10 ft of it is in direct contact with the earth, and it must be supplemented by another electrode (250.53(D)(2)). Separately, the code allows the grounding electrode conductor to connect to interior metal water piping within 5 ft of where it enters the building. That connection point is a convenience. The first few feet inside the building are not in contact with the earth, so they are not the electrode.

Myth 4: Pick whichever electrode is cheapest and ignore the rest

Fact: Under 250.50, the electrodes described in 250.52(A)(1) through (A)(7) that are present at the building must be bonded together. The "other metal underground systems" in (A)(8) are different: they are not required to be added, and bonding them does not satisfy 250.50 by itself. If none of the first seven are present, you build one or more from the list that you can install, such as a rod, ring or plate. Existing buildings have an exception for concrete-encased electrodes when bonding to them could damage the concrete. Treat that as a detail to read in your own edition.

Myth 5: Rebar in a footing is only structural

Fact: Rebar can be a concrete-encased electrode. The requirement is at least 20 ft of steel reinforcing bar, at least 1/2 in. in diameter, or 20 ft of bare copper no smaller than 4 AWG, with at least 2 in. of concrete cover, in a foundation or footing in direct contact with the earth. If several are present, only one needs to be bonded into the system. This is why a new building often has a good electrode that nobody sees.

Myth 6: The electrode decides the size of the grounding electrode conductor

Fact: The grounding electrode conductor is sized from Table 250.66, based on the largest ungrounded service conductor. The type of electrode only sets a ceiling in some cases: a connection to a rod, pipe or plate needs no larger than 6 AWG copper, and a connection to a concrete-encased electrode needs no larger than 4 AWG copper (250.66(A) and (B)). Ground ring connections need no larger than the ring conductor itself (250.66(C)). For the full sizing method, see our guide to EGC vs GEC sizing.

Three exam habits

  1. List what is physically present before you pick anything. The answer to "which electrodes must be bonded" depends on the building in the question.
  2. Check the not-permitted list when an option sounds practical. Gas pipe and aluminum are the classic distractors.
  3. Look for the 25 ohm condition when the question mentions a single rod.

Where to read the real text

The NEC is published by NFPA. You can read it free online with an account at NFPA 70 on nfpa.org. NFPA also publishes a grounding and bonding fact sheet, which one city hosts as a PDF from its fire department. For training-style explanations, see the 2023 NEC grounding and bonding overview on EE Power and a grounding electrode system summary from Mike Holt. Always confirm which edition your state has adopted and whether local amendments apply, and ask the AHJ if a field condition is unclear.

Practice with the course

If you want worked calculations alongside the code rules, the CircuitDrill calculations course covers the math side of the journeyman exam. CircuitDrill is an independent study tool and is not affiliated with NFPA, the NEC or any exam provider. The blog index at circuitdrill.com/blog lists the rest of the code and calculation guides.

Frequently asked questions

What are the permitted grounding electrodes in NEC 250.52(A)?

The list covers metal underground water pipe, metal in-ground support structures, concrete-encased electrodes, ground rings, rod and pipe electrodes, listed electrodes, plate electrodes, and other local metal underground systems.

Can underground gas piping be used as a grounding electrode?

No. Underground metal gas piping systems are listed in 250.52(B) as not permitted for use as grounding electrodes. Aluminum is on the same list.

When does a single ground rod need a second electrode?

Under 250.53(A)(2), a single rod, pipe or plate electrode must be supplemented unless its resistance to earth is 25 ohms or less. Added rods must be at least 6 ft apart.

Is one electrode enough if several are present at the building?

No. Under 250.50 the electrodes in 250.52(A)(1) through (A)(7) that are present are bonded together to form the grounding electrode system. Check your adopted edition for exceptions.