Working space questions are popular on exams because they are short, concrete and easy to get wrong by one number. This article is built as a quiz and a checklist. Read the quick reference first, try the seven questions, then use the checklist as your last review before an exam or a walk-through.
Section numbers and values follow the 2020 and 2023 editions of NFPA 70. Your state may have adopted a different edition, and the authority having jurisdiction (AHJ) decides what applies. Read the actual text in your own code book.
Quick reference: the working space box
Section 110.26 requires sufficient access and working space around electrical equipment that is likely to need examination, adjustment, servicing or maintenance while energized. Think of the space as a box in front of the equipment:
- Width: at least 30 in., or the width of the equipment if that is greater. The space does not have to be centered on the equipment.
- Height: at least 6.5 ft, or the height of the equipment if that is greater.
- Depth: from Table 110.26(A)(1), based on the voltage to ground and the condition of what is across from the equipment.
- Doors: equipment doors and hinged panels must be able to open at least 90 degrees.
- Storage: the working space may not be used for storage.
Depth by condition
| Voltage to ground | Condition 1 | Condition 2 | Condition 3 |
|---|---|---|---|
| 0 to 150 V | 3 ft | 3 ft | 3 ft |
| 151 to 600 V | 3 ft | 3.5 ft | 4 ft |
| 601 to 1000 V | 3 ft | 4 ft | 5 ft |
- Condition 1: exposed live parts on one side, and no live or grounded parts on the other side, or live parts on both sides guarded by insulating material.
- Condition 2: exposed live parts on one side and grounded parts on the other. Concrete, brick and tile walls count as grounded.
- Condition 3: exposed live parts on both sides, such as two panels facing each other.
The seven-question quiz
Cover the answers, decide, then open each one.
Question 1
A panel is 36 in. wide. What is the minimum width of its working space?
Show the answer
36 in. The width is 30 in. or the width of the equipment, whichever is greater. A 36 in. panel is wider than 30 in., so the equipment width applies.
Question 2
What is the minimum headroom for the working space in front of a panelboard that is 6 ft tall?
Show the answer
6.5 ft. The minimum is 6.5 ft, or the height of the equipment if that is greater. A 6 ft panel is shorter than 6.5 ft, so 6.5 ft applies.
Question 3
A 480Y/277 V panelboard has exposed live parts and faces a concrete wall. What is the minimum depth?
Show the answer
3 ft 6 in. The voltage to ground is 277 V, so use the 151 to 600 V row. Concrete counts as grounded, which makes this Condition 2: 3.5 ft.
Question 4
Two 208Y/120 V panelboards face each other across an electrical room. What is the minimum depth?
Show the answer
3 ft. The voltage to ground is 120 V, so use the 0 to 150 V row. That row is 3 ft for all three conditions, even with live parts on both sides.
Question 5
Two 480Y/277 V panelboards face each other. What is the minimum depth?
Show the answer
4 ft. Live parts on both sides is Condition 3. In the 151 to 600 V row, Condition 3 is 4 ft.
Question 6
A 1200 A switchboard is 8 ft wide and contains overcurrent devices. What changes about the entrance to the working space?
Show the answer
A second entrance is required. Section 110.26(C)(2) requires additional entrance and exit for equipment rated 1200 A or more that is over 6 ft wide and contains overcurrent, switching or control devices. Read your edition for the exceptions.
Question 7
Can a few boxes of fittings sit on the floor inside the working space as long as the panel door still opens?
Show the answer
No. The working space may not be used for storage, under 110.26(B).
Checklist
- Width: at least 30 in., or the equipment width if greater.
- Height: at least 6.5 ft, or the equipment height if greater.
- Depth: find the voltage to ground, then the condition, then read Table 110.26(A)(1).
- Doors and hinged panels open at least 90 degrees.
- No storage in the working space.
- Dedicated space above indoor equipment: the width and depth of the equipment, from the floor up to 6 ft above the equipment or to the structural ceiling, whichever is lower, kept clear of piping, ducts and other non-electrical equipment.
- Large equipment (1200 A or more, over 6 ft wide): check the entrance and exit rules.
- Lighting: required for the working space around service equipment, switchboards, panelboards and motor control centers installed indoors.
- Confirm the edition and local amendments with the AHJ.
Common mistakes
- Using the line voltage instead of the voltage to ground when you read the table.
- Forgetting that concrete, brick and tile walls count as grounded.
- Reading Condition 3 as the same as Condition 2.
- Thinking the space must be centered on the equipment.
- Counting a shelf or a parked cart in the space as "temporary" when the code says no storage.
OSHA has a matching rule
For workplaces, OSHA 29 CFR 1910.303(g)(1) contains similar requirements: working space width of 30 in. or the equipment width, doors that open at least 90 degrees, no storage in the working space, headroom of 6.5 ft for installations built on or after August 13, 2007, and extra entrances for large equipment. The depth table in OSHA's standard is a separate table, so read it directly.
Where to read more
The NEC is published by NFPA and can be read free online with an account at NFPA 70 on nfpa.org. The workplace rule is in OSHA 1910.303. For practical explanations of Table 110.26(A)(1), see VoltageLab's panel clearance guide and ExpertCE's working clearance overview. Always check the code text for your adopted edition.
Practice
For more study material, the CircuitDrill calculations course covers the math side of the journeyman exam, and the blog index lists the rest of the guides. CircuitDrill is an independent study tool and is not affiliated with NFPA, the NEC or any exam provider.
Frequently asked questions
How wide must the working space be under NEC 110.26?
At least 30 in., or the width of the equipment if that is greater. The space does not have to be centered on the equipment.
What is the minimum headroom for the working space?
At least 6.5 ft, or the height of the equipment if that is greater.
How do I find the required depth of the working space?
Use Table 110.26(A)(1). Find the nominal voltage to ground, then the condition: live parts on one side only, live parts on one side and grounded parts on the other, or live parts on both sides. Concrete, brick and tile walls count as grounded.
Can I store materials in the working space?
No. The working space may not be used for storage, and equipment doors must be able to open at least 90 degrees.
Free
Get 5 worked problems right away
Voltage drop, conduit fill, box fill, Ohm's law and derating. One problem each, solved line by line. They open right after you sign up.
Voltage drop calculator with every step shown
Single-phase or three-phase, copper or aluminum, 14 AWG to 500 kcmil.