Motor Overload Protection Sizing: NEC 430.32, 125% vs 115%
Motor questions on the electrician exam often come down to one habit: using the right current for the right job. Overload protection is sized from the motor's nameplate. Conductors are sized from the NEC tables. Mix those up and the whole answer is wrong, even if the arithmetic is clean. This guide walks through NEC 430.32 with a full worked example you can repeat on exam day.
What overload protection is for
An overload device protects the motor and its branch-circuit conductors from running too hot over time. It is not the same thing as short-circuit and ground-fault protection. The breaker or fuse sized under 430.52 handles faults, and the overload device handles a motor that is carrying too much load for too long. A trade-magazine explanation of Article 430 puts the split plainly: branch-circuit fuses or breakers protect against short circuits and ground faults, while overload devices in the controller or built into the motor protect against overload (Electrical Contractor magazine).
Which current do you use?
This is the point that costs the most marks. For overload sizing, use the nameplate full-load current, often printed as FLA. For branch-circuit conductors, you use the full-load current from the NEC tables (Tables 430.247 through 430.250), which is a different number. A code-basics article on motor calculations states the rule this way: overload devices are sized from the motor nameplate current under 430.6(A)(2) and 430.31, while conductors use the table value times 125 percent under 430.22 (EC&M, Motor Calculations Part 1).
- Overload device: nameplate FLA times a percentage from 430.32.
- Conductors: table FLC times 125 percent.
- Short-circuit and ground-fault device: a percentage of the table FLC under 430.52.
The two percentages in 430.32(A)(1)
For continuous-duty motors over 1 horsepower, the overload device is set at no more than a percentage of the nameplate current. The percentage depends on what the nameplate says:
| Nameplate marking | Maximum overload rating |
|---|---|
| Service factor of 1.15 or greater, or marked temperature rise of 40 degrees C or less | 125 percent of nameplate current |
| All other motors | 115 percent of nameplate current |
A Department of Defense facilities criteria document that incorporates NEC 430.32 states both limits in these terms: no more than 125 percent for continuous-duty motors over 1 horsepower with a marked service factor of at least 1.15 or a temperature rise not over 40 degrees C, and no more than 115 percent for all other continuous-duty motors over 1 horsepower (UFC 3-520-01, section 9-6.6.1). That document cites the 2002 NEC, so confirm the wording in the edition your state has adopted.
Worked example
This is a practice problem with made-up nameplate values, not a real product. A continuous-duty three-phase motor over 1 horsepower has a nameplate full-load current of 28.0 A.
Case A: service factor 1.15
- Read the nameplate. Service factor 1.15 meets the first row of the table.
- Choose the multiplier: 125 percent, or 1.25.
- Calculate: 28.0 A x 1.25 = 35.0 A.
Case B: service factor 1.00 and no temperature rise marked
- Neither condition in the first row is met, so this is an "all other motors" case.
- Choose the multiplier: 115 percent, or 1.15.
- Calculate: 28.0 A x 1.15 = 32.2 A.
Same motor current, two different answers, three amps apart. That gap is exactly why exam writers like this topic. Read the nameplate for the service factor and the temperature rise before you touch the calculator.
When the calculated value will not start the motor
Section 430.32(C) allows a higher setting when the first one is not enough to start the motor or carry the load. Two sources agree on the numbers: no more than 140 percent for the 1.15 service factor or 40 degrees C group, and no more than 130 percent for all other motors (EEPower technical article, and an EC&M code quiz). Using the same 28.0 A motor:
- Case A at the higher limit: 28.0 A x 1.40 = 39.2 A.
- Case B at the higher limit: 28.0 A x 1.30 = 36.4 A.
Treat the higher limit as a ceiling to use only when needed, not as a new starting point. Start with 125 or 115 percent, and move up only if the motor cannot start or carry its load.
Common mistakes
- Using the table FLC for overloads. Overloads follow the nameplate. The table value is for conductors and for fault protection.
- Assuming 125 percent every time. A motor with a 1.00 service factor and no marked temperature rise falls under the 115 percent row.
- Mixing up the sections. 430.32(A)(1) gives the base percentages. 430.32(C) gives the higher limits.
- Treating the overload as fault protection. The overload device does not replace the short-circuit and ground-fault device.
- Ignoring the scope. The percentages above apply to continuous-duty motors over 1 horsepower. Smaller motors and other duty types have their own rules, so read the full section.
A quick self-check
Try this one before moving on. A continuous-duty motor over 1 horsepower has a nameplate current of 20.0 A, a service factor of 1.08, and a marked temperature rise of 50 degrees C. What is the maximum overload rating? Neither condition for 125 percent is met, so use 115 percent: 20.0 A x 1.15 = 23.0 A. If you answered 25.0 A, you applied 125 percent without checking the nameplate.
Read the real code
This article is a study aid. The wording, the section numbers and the adopted edition vary by jurisdiction, so use your own code book and ask your local authority having jurisdiction (AHJ) when a real installation is involved. The National Fire Protection Association publishes NFPA 70 and offers free online access to the text at nfpa.org. CircuitDrill is an independent study tool and is not affiliated with NFPA or the NEC.
Keep practicing
If you want more worked problems like this one, the CircuitDrill course covers the calculations in the same step-by-step style, and the earlier guide on motor circuit calculations shows how the FLC tables, overloads and branch circuits fit together.
Frequently asked questions
Do I size motor overload protection from the nameplate or the NEC table?
Overload protection is sized from the nameplate full-load current. The NEC tables (430.247 through 430.250) are used for branch-circuit conductors and for short-circuit and ground-fault protection.
When is the overload limit 125 percent and when is it 115 percent?
Under 430.32(A)(1), 125 percent applies to a motor with a service factor of 1.15 or greater, or a marked temperature rise of 40 degrees C or less. All other motors use 115 percent.
What if the calculated overload value will not start the motor?
Section 430.32(C) allows a higher limit: 140 percent for the 1.15 service factor or 40 degrees C group, and 130 percent for all other motors. Confirm the wording in your adopted NEC edition.
Does the overload device replace the breaker or fuse?
No. The overload device protects against sustained overcurrent from overload. The branch-circuit device sized under 430.52 handles short circuits and ground faults.
Free
Get 5 worked problems right away
Voltage drop, conduit fill, box fill, Ohm's law and derating. One problem each, solved line by line. They open right after you sign up.
Voltage drop calculator with every step shown
Single-phase or three-phase, copper or aluminum, 14 AWG to 500 kcmil.